Aluminum die casting porosity matters when internal voids affect a part’s required strength, machined surface, seal or appearance. Machining can expose voids that were not visible on the original casting surface, so acceptance must address the final manufacturing stage. Begin by identifying the critical zones and their functions, then agree suitable inspection and test methods. Do not specify “zero porosity” without defining what is being assessed and how. A cosmetic bracket, a threaded attachment and a pressure-containing housing need different evidence, even when all three are made by die casting.
Separate the defect from its functional consequence
Porosity describes voids inside the metal, but the word alone does not define whether a part is usable. A small isolated internal void and a connected path through a sealing wall raise different questions. The engineering decision must connect the observed condition to the function of the affected region. Location matters alongside size, distribution and connectivity.
Start with a marked drawing. Identify sealing lands, threaded holes, loaded mounting regions and visible cosmetic faces. Also mark surfaces that will be machined later, including work performed by the buyer or another supplier. A supplier cannot plan a meaningful control strategy if the quotation shows only the raw casting while the most important requirement applies after a later machining operation.
Avoid drawing conclusions from a single attractive sample. A smooth exterior is useful appearance evidence, but it does not show the internal condition. Likewise, a visible pore in a noncritical section does not by itself establish that every casting in a lot is unfit. The inspection plan should state which observations trigger rejection, further examination or an engineering disposition.
Why machining changes the inspection question
Machining removes material and creates a new exposed surface. A void below the original skin may appear as a pit after cutting, or a connected void network may intersect a functional passage. That is why the final machined condition must be part of the acceptance discussion, especially when the feature seals or contains fluid.
The Metal Casting Institute’s post-casting guidance explains the relationship between machining, opened porosity and leak testing. The practical consequence is to place the relevant test after operations that can change the leak path. A pre-machining result cannot automatically release a component whose final sealing surface does not yet exist.
Show the machining envelope on the casting model. Include the surfaces that will be faced, drilled, bored or threaded, and identify the final dimensions. Where the casting and machining are split between companies, agree who owns the stock allowance review and who approves an unexpectedly exposed condition. Photograph suspect parts before further processing so that the original observation remains available for investigation.

Choose evidence for the actual requirement
Visual inspection evaluates accessible surfaces. It can find exposed pits and other visible conditions, but it cannot establish the absence of internal voids. Radiography or computed tomography can provide internal information when the selected method, resolution and viewing arrangement suit the region being examined. The engineering team should define what the resulting images need to demonstrate.
A leak test addresses leakage under specified conditions. It does not measure every aspect of internal soundness or establish structural performance. A part may contain isolated voids without a through-path, while another defect can cause leakage without appearing as a conspicuous surface pit. Use the test to answer its intended question rather than treating one result as a complete quality certificate.
Destructive sectioning can help investigate a local condition, but the cut location determines what is seen. Preserve the relationship between the section and the drawing. For recurring problems, compare samples with production traceability instead of choosing sections solely because they look dramatic. Select the methods with the responsible engineer and qualified inspection provider, particularly for safety or pressure applications.
Build a practical acceptance matrix
This matrix is a planning tool. It contains no universal pore-size limits or leak-rate limits. Those values must be agreed from the application, drawing, test method and relevant requirements. The NADCA quality guidance emphasizes communicating pressure requirements and testing methods when pressure-tight castings are required.
On narrow screens, scroll the table sideways to read every column.
| Functional region | Main concern | Evidence to agree |
|---|---|---|
| Machined sealing face | Pits or connected paths affecting the seal | Final-surface acceptance and application-specific leak test |
| Threaded attachment | Material condition around the engagement | Thread inspection and engineering-defined load validation |
| Loaded mounting region | Internal condition affecting the load path | Approved internal examination and structural validation plan |
| Visible exterior | Appearance after finishing | Cosmetic zones and agreed visual reference |
| Nonfunctional internal region | Unnecessary rejection from vague wording | Zone-specific acceptance and engineering disposition rules |
State whether the inspection is a qualification activity, a production control or a final release test. These purposes can require different sample selection and records. Also identify which party can approve a deviation. An inspector should not have to infer from a photograph whether a casting is safe for a use that was never described.
Keep process investigation distinct from sorting
Inspection can contain suspect output, but sorting alone does not explain why a problem occurred. A useful investigation connects the affected region to the filling, venting, thermal and solidification conditions of the actual tool. Ask the die caster for a documented investigation rather than prescribing a process change from a photograph.
Maintain cavity and production traceability when parts are compared. If a condition appears only after a machining change, compare the removed stock and fixture setup as well as the casting records. A deeper cut can reveal a previously hidden condition without proving that the casting process suddenly changed. Equally, a stable machining setup does not rule out variation in the raw castings.
Agree how suspect lots will be held and identified. Keep accepted, rejected and investigation samples separate, with a clear record of their condition. If extra inspection is introduced, define its duration and exit criteria. Temporary containment becomes expensive and confusing when nobody specifies what evidence will permit return to the normal release plan.

Consider design changes before adding inspections indefinitely
Review abrupt section changes, heavy local masses and critical machined regions with the casting engineer. A design review may identify opportunities to improve manufacturability or relocate a sensitive feature. These decisions require the actual geometry and process knowledge; a generic checklist cannot establish that a specific change will eliminate porosity.
The NADCA commercial practices guide supports communicating machining and drawing requirements early. For the buyer, this means sharing the final component requirements before the die is ordered. If leak tightness or a critical machined surface is introduced later, the original tool and quotation may not have been planned around it.
Do not tighten every dimension as a substitute for defining internal quality. Dimensional accuracy and porosity are different characteristics. Additional machining can improve a dimension while exposing an internal void. Evaluate the combined route: casting, trimming, machining, finishing and final verification. The acceptance plan should follow the component through that route instead of stopping at the raw casting.
Treat impregnation as an agreed process decision
Impregnation may be considered for certain leakage paths when the application and responsible engineer permit it. It should never be assumed to restore missing structural material or qualify an otherwise unacceptable casting. Define the approved process, part condition, subsequent operations and required verification before using it on production components.
Ask whether impregnation is included in the original manufacturing route or proposed as a corrective action. Those are different commercial and engineering situations. Review cleanliness, compatibility and downstream assembly needs with the relevant specialists. If machining after treatment can change the exposed condition, the final test sequence needs to reflect that possibility.
Keep the release record explicit. A statement that a part was impregnated is a process record, not a substitute for the specified final acceptance evidence. If the customer prohibits the process, that restriction belongs in the quotation package and purchase requirements. If it is allowed only after approval, identify the approval owner and retain the agreed disposition with the lot documentation.
What to include in an aluminum casting RFQ
Supply the final model, controlled drawing, alloy requirement, expected quantities and full secondary-operation route. Mark the regions where porosity can affect a seal, thread, load path or visible surface. Include the intended environment and service conditions to the extent needed for engineering review. Avoid unsupported requirements copied from a different component with a different function.
Request an inspection proposal that names the method, stage, sampling basis, acceptance reference and reporting format. For a leak test, define the medium, pressure conditions, stabilization approach and acceptance criterion with the responsible engineer. This article does not set those values. A number without its method and conditions is not a reproducible requirement.
Stick Industry’s aluminum die casting product page and manufacturing capabilities provide the relevant starting points for discussing a project. The pictured catalog housing illustrates geometry only; it is not evidence of pressure rating, internal inspection or an actual leak-test result. For related planning, see the die casting supplier guide and injection molding cost comparison context.
Watch the manufacturing process
North American Die Casting Association: Cold Chamber Die Casting Process. This independent educational video provides process context for the design and inspection discussion.
Watch Cold Chamber Die Casting Process on YouTube
Frequently asked questions
Does a smooth casting surface prove low porosity?
No. Surface appearance does not reveal all internal voids. Choose internal examination or functional testing where the application requires it, and specify the region and acceptance basis rather than relying on a photograph.
Should leakage be checked before or after machining?
The release plan must cover the final condition relevant to the requirement. Machining can expose internal paths, so an earlier test alone cannot establish the condition after material has been removed.
Does every casting need the same internal inspection?
No universal plan suits every component. Select evidence according to function, risk, geometry and contractual requirements. The responsible engineering team should approve the method and limits before production starts.